Nautilus code panel unsynchronized with 4.0
Hello, I noted, twice since yesterday, Nautilus can have code panel contents unsynchronized between two instances of itself: - two nautilus windows on the same class - edit a method in window 1 - look at the modified method on window 2, it is the old code Hilaire -- Dr. Geo http://drgeo.eu
Indeed, there's an old issue for that https://pharo.fogbugz.com/f/cases/13111/Browser-with-no-method-selected-does... On Fri, Mar 4, 2016 at 3:56 PM, Hilaire <hilaire@drgeo.eu> wrote:
Hello,
I noted, twice since yesterday, Nautilus can have code panel contents unsynchronized between two instances of itself:
- two nautilus windows on the same class - edit a method in window 1 - look at the modified method on window 2, it is the old code
Hilaire
-- Dr. Geo http://drgeo.eu
Yeah I guessed so. Cool. Thanks Le 04/03/2016 16:02, Peter Uhnák a écrit :
Indeed, there's an old issue for that https://pharo.fogbugz.com/f/cases/13111/Browser-with-no-method-selected-does...
-- Dr. Geo http://drgeo.eu
Hilaire How much time do you expect your migration to take? Because I would be you - I would try to develop in Pharo 50 the tools are much better - faster list - Spotter much much much better - faster nautilus - faster system in general - and if you find a bug people will help Then I would be you I would do the following: - create a configuration and a jenkins job that manages stable version of 40 and 50 (the same version in fact) - let the dev to be a baseline. - develop as much as possible in 50 if you get really blocked then switch to 40. - like that you can develop in 50 and deploy in 40. Ok this is a bit more work. But in one year a lot have improved (yes there are some parts that are a bit shaky). Stef Le 4/3/16 15:56, Hilaire a écrit :
Hello,
I noted, twice since yesterday, Nautilus can have code panel contents unsynchronized between two instances of itself:
- two nautilus windows on the same class - edit a method in window 1 - look at the modified method on window 2, it is the old code
Hilaire
Le 06/03/2016 11:31, stepharo a écrit :
How much time do you expect your migration to take?
The migration is already done. And althought I mentionned in the list the problems I met, it went pretty fine. My application is still in development, so no configuration yet. I will move later soon to 5.0. For DrGeo, migrating to 4.0 or 5.0 may be more complicate, it will be for a later time :) Hilaire -- Dr. Geo http://drgeo.eu
participants (3)
-
Hilaire -
Peter Uhnák -
stepharo