March 3, 2013
8:37 p.m.
So what do we do? because frankly I'm fed up and when I see 10 then 102 for a baseline when we had dependency to a project that else makes sure that the system does not work at all I'm puzzled. Now I do not have the time to change that. if you have go ahead. A bit of rigor and consistency would help. I do not understand why programmer number things like that at leas we should have 1.1 1.2 2.0 means major changes to me 1.0.2 does not mean nothing. Stef