I personally thing if we ever want to release 1.2, we need to start to be more radical. The XML package breaks the build? So let's remove it completely. Let's ship 1.2, but without all the packages that are problematic. Same for any other package that has a failing test. Marcus On Feb 25, 2011, at 1:12 PM, Torsten Bergmann wrote:
Still I do not understand:
Evaluate this in an updated Pharo core 1.2:
------------------------------------------------------------------------ Gofer new squeaksource: 'MetacelloRepository'; package: 'ConfigurationOfXMLSupport'; load.
(Smalltalk at: #ConfigurationOfXMLSupport) project latestVersion ------------------------------------------------------------------------
returns 1.1.8 [ConfigurationOfXMLSupport]
This is now broken by Otto. OK, he broke it, he has to repair it ;)
But independent from that, the method in:
ConfigurationOfPharo>>version12beta2:
includes the following:
project: 'XMLSupport' with: '1.1.6'.
So I would have expected that for Pharo "1.2-beta2" the 1.1.6 (and not the 1.1.8) of XMLSupport gets loaded and Hudson should have been green.
Why does Metacello load the 1.1.8 when a previous project version (1.1.6) is referenced?
Dale, any comments?
Bye T.
-- Empfehlen Sie GMX DSL Ihren Freunden und Bekannten und wir belohnen Sie mit bis zu 50,- Euro! https://freundschaftswerbung.gmx.de
-- Marcus Denker -- http://www.marcusdenker.de INRIA Lille -- Nord Europe. Team RMoD.
Marcus, I've worked on this this week: - I've fixed ReleaseTest.testUndeclared and RBInlineMethodFromComponentTest.testInlineEmptyComponentMethod - For all Metacello tests, the fix is available but Dale said: "I haven't released my changes yet ... once I'm satisfied with the the behavior on PharoCore1.2 (that's where I'm doing development) I now have to get the new version of Gofer ported to Squeak and GemStone before I can make the full release ... otherwise the tests will be failing on Squeak/GemStone ..." I think this is really problematic to wait for Squeak/GemStone but one way to go forward is to put them in #expectedFailures - For XML I can fix this tonight if Otto don't want / can do it. So there's only one failing test without fix awaiting: ReleaseTest.testObsoleteClasses. Guillermo and I had a look at it on Monday: GuilleP: Ok, obsoletes come from: ClassRenameFixTest seems to be creating an AutoGeneratedClassForTestingSystemChanges GuilleP: But I can't find the source of AnObsoleteMCMockClassG :( laurentlaffont: it comes from MCMockPackageInfo>>#classNames laurentlaffont: see also the comment in MCPackageTest>>#tearDown some work needed to fix this. But I agree that it seems few people care about 1.2. Sad, I like it far better than 1.1.1. Laurent. On Fri, Feb 25, 2011 at 1:18 PM, Marcus Denker <marcus.denker@inria.fr>wrote:
I personally thing if we ever want to release 1.2, we need to start to be more radical.
The XML package breaks the build? So let's remove it completely. Let's ship 1.2, but without all the packages that are problematic.
Same for any other package that has a failing test.
Marcus
On Feb 25, 2011, at 1:12 PM, Torsten Bergmann wrote:
Still I do not understand:
Evaluate this in an updated Pharo core 1.2:
------------------------------------------------------------------------ Gofer new squeaksource: 'MetacelloRepository'; package: 'ConfigurationOfXMLSupport'; load.
(Smalltalk at: #ConfigurationOfXMLSupport) project latestVersion ------------------------------------------------------------------------
returns 1.1.8 [ConfigurationOfXMLSupport]
This is now broken by Otto. OK, he broke it, he has to repair it ;)
But independent from that, the method in:
ConfigurationOfPharo>>version12beta2:
includes the following:
project: 'XMLSupport' with: '1.1.6'.
So I would have expected that for Pharo "1.2-beta2" the 1.1.6 (and not the 1.1.8) of XMLSupport gets loaded and Hudson should have been green.
Why does Metacello load the 1.1.8 when a previous project version (1.1.6) is referenced?
Dale, any comments?
Bye T.
-- Empfehlen Sie GMX DSL Ihren Freunden und Bekannten und wir belohnen Sie mit bis zu 50,- Euro! https://freundschaftswerbung.gmx.de
-- Marcus Denker -- http://www.marcusdenker.de INRIA Lille -- Nord Europe. Team RMoD.
- For XML I can fix this tonight if Otto don't want / can do it.
1.1.9 was blessed as #development and 1.1.8 as #release. I changed the blessing 1.1.9 to #released. I do believe that the 1.1.9 version works well. 1.1.8 is now #broken. Sorry about that. Thanks for the help. I'm doing a load in Pharo 1.2 now...
On Fri, Feb 25, 2011 at 4:53 PM, Otto Behrens <otto@finworks.biz> wrote:
- For XML I can fix this tonight if Otto don't want / can do it.
1.1.9 was blessed as #development and 1.1.8 as #release. I changed the blessing 1.1.9 to #released. I do believe that the 1.1.9 version works well. 1.1.8 is now #broken.
Sorry about that. Thanks for the help.
I'm doing a load in Pharo 1.2 now...
Thank you Otto Laurent.
I've downloaded the PharoOneClick1.2.zip file and am evaluating (ConfigurationOfPharo project version: '1.2-beta2') load now. This is the best "entry point" that I could determine from the console output. Please let me know if this is OK. My bandwidth is not amazing, but it's running. On Fri, Feb 25, 2011 at 5:53 PM, Otto Behrens <otto@finworks.biz> wrote:
- For XML I can fix this tonight if Otto don't want / can do it.
1.1.9 was blessed as #development and 1.1.8 as #release. I changed the blessing 1.1.9 to #released. I do believe that the 1.1.9 version works well. 1.1.8 is now #broken.
Sorry about that. Thanks for the help.
I'm doing a load in Pharo 1.2 now...
It loaded and XML-Tests-Parser reports: 361 run, 361 passes, 0 expected failures, 0 failures, 0 errors, 0 unexpected passes Running all tests now (11240) ... On Fri, Feb 25, 2011 at 6:04 PM, Otto Behrens <otto@finworks.biz> wrote:
I've downloaded the PharoOneClick1.2.zip file and am evaluating
 (ConfigurationOfPharo project version: '1.2-beta2') load
now. This is the best "entry point" that I could determine from the console output. Please let me know if this is OK. My bandwidth is not amazing, but it's running.
On Fri, Feb 25, 2011 at 5:53 PM, Otto Behrens <otto@finworks.biz> wrote:
- For XML I can fix this tonight if Otto don't want / can do it.
1.1.9 was blessed as #development and 1.1.8 as #release. I changed the blessing 1.1.9 to #released. I do believe that the 1.1.9 version works well. 1.1.8 is now #broken.
Sorry about that. Thanks for the help.
I'm doing a load in Pharo 1.2 now...
Hi otto no stress. :) There is no problem. Doing something implies that we can do it wrong (I do all the times mistakes and I hope that I learn to improve myself). I prefer having a community of people doing some wrong actions than just talking. Stef On Feb 25, 2011, at 4:53 PM, Otto Behrens wrote:
- For XML I can fix this tonight if Otto don't want / can do it.
1.1.9 was blessed as #development and 1.1.8 as #release. I changed the blessing 1.1.9 to #released. I do believe that the 1.1.9 version works well. 1.1.8 is now #broken.
Sorry about that. Thanks for the help.
I'm doing a load in Pharo 1.2 now...
Marcus I would not add XML in dev. just dev tools no extra package. So yes let us remove XML package. I already asked for that. Now the problem encountered reveal something deeper. STef On Feb 25, 2011, at 1:18 PM, Marcus Denker wrote:
I personally thing if we ever want to release 1.2, we need to start to be more radical.
The XML package breaks the build? So let's remove it completely. Let's ship 1.2, but without all the packages that are problematic.
Same for any other package that has a failing test.
Marcus
On Feb 25, 2011, at 1:12 PM, Torsten Bergmann wrote:
Still I do not understand:
Evaluate this in an updated Pharo core 1.2:
------------------------------------------------------------------------ Gofer new squeaksource: 'MetacelloRepository'; package: 'ConfigurationOfXMLSupport'; load.
(Smalltalk at: #ConfigurationOfXMLSupport) project latestVersion ------------------------------------------------------------------------
returns 1.1.8 [ConfigurationOfXMLSupport]
This is now broken by Otto. OK, he broke it, he has to repair it ;)
But independent from that, the method in:
ConfigurationOfPharo>>version12beta2:
includes the following:
project: 'XMLSupport' with: '1.1.6'.
So I would have expected that for Pharo "1.2-beta2" the 1.1.6 (and not the 1.1.8) of XMLSupport gets loaded and Hudson should have been green.
Why does Metacello load the 1.1.8 when a previous project version (1.1.6) is referenced?
Dale, any comments?
Bye T.
-- Empfehlen Sie GMX DSL Ihren Freunden und Bekannten und wir belohnen Sie mit bis zu 50,- Euro! https://freundschaftswerbung.gmx.de
-- Marcus Denker -- http://www.marcusdenker.de INRIA Lille -- Nord Europe. Team RMoD.
+1 El 25/02/2011, a las 1:09p.m., Stéphane Ducasse escribió:
Marcus
I would not add XML in dev. just dev tools no extra package. So yes let us remove XML package. I already asked for that. Now the problem encountered reveal something deeper.
STef
On Feb 25, 2011, at 1:18 PM, Marcus Denker wrote:
I personally thing if we ever want to release 1.2, we need to start to be more radical.
The XML package breaks the build? So let's remove it completely. Let's ship 1.2, but without all the packages that are problematic.
Same for any other package that has a failing test.
Marcus
On Feb 25, 2011, at 1:12 PM, Torsten Bergmann wrote:
Still I do not understand:
Evaluate this in an updated Pharo core 1.2:
------------------------------------------------------------------------ Gofer new squeaksource: 'MetacelloRepository'; package: 'ConfigurationOfXMLSupport'; load.
(Smalltalk at: #ConfigurationOfXMLSupport) project latestVersion ------------------------------------------------------------------------
returns 1.1.8 [ConfigurationOfXMLSupport]
This is now broken by Otto. OK, he broke it, he has to repair it ;)
But independent from that, the method in:
ConfigurationOfPharo>>version12beta2:
includes the following:
project: 'XMLSupport' with: '1.1.6'.
So I would have expected that for Pharo "1.2-beta2" the 1.1.6 (and not the 1.1.8) of XMLSupport gets loaded and Hudson should have been green.
Why does Metacello load the 1.1.8 when a previous project version (1.1.6) is referenced?
Dale, any comments?
Bye T.
-- Empfehlen Sie GMX DSL Ihren Freunden und Bekannten und wir belohnen Sie mit bis zu 50,- Euro! https://freundschaftswerbung.gmx.de
-- Marcus Denker -- http://www.marcusdenker.de INRIA Lille -- Nord Europe. Team RMoD.
I didn't try it yet, but using metacello browser, and letting it have a project description, will do the work for us ;). On Fri, Feb 25, 2011 at 1:09 PM, Stéphane Ducasse <stephane.ducasse@inria.fr
wrote:
Marcus
I would not add XML in dev. just dev tools no extra package. So yes let us remove XML package. I already asked for that. Now the problem encountered reveal something deeper.
STef
On Feb 25, 2011, at 1:18 PM, Marcus Denker wrote:
I personally thing if we ever want to release 1.2, we need to start to be more radical.
The XML package breaks the build? So let's remove it completely. Let's ship 1.2, but without all the packages that are problematic.
Same for any other package that has a failing test.
Marcus
On Feb 25, 2011, at 1:12 PM, Torsten Bergmann wrote:
Still I do not understand:
Evaluate this in an updated Pharo core 1.2:
------------------------------------------------------------------------ Gofer new squeaksource: 'MetacelloRepository'; package: 'ConfigurationOfXMLSupport'; load.
(Smalltalk at: #ConfigurationOfXMLSupport) project latestVersion ------------------------------------------------------------------------
returns 1.1.8 [ConfigurationOfXMLSupport]
This is now broken by Otto. OK, he broke it, he has to repair it ;)
But independent from that, the method in:
ConfigurationOfPharo>>version12beta2:
includes the following:
project: 'XMLSupport' with: '1.1.6'.
So I would have expected that for Pharo "1.2-beta2" the 1.1.6 (and not the 1.1.8) of XMLSupport gets loaded and Hudson should have been green.
Why does Metacello load the 1.1.8 when a previous project version (1.1.6) is referenced?
Dale, any comments?
Bye T.
-- Empfehlen Sie GMX DSL Ihren Freunden und Bekannten und wir belohnen Sie mit bis zu 50,- Euro! https://freundschaftswerbung.gmx.de
-- Marcus Denker -- http://www.marcusdenker.de INRIA Lille -- Nord Europe. Team RMoD.
participants (6)
-
Esteban Lorenzano -
Guillermo Polito -
laurent laffont -
Marcus Denker -
Otto Behrens -
Stéphane Ducasse