1. Creation of the Pharo Consortium -> Created
DONE
2. Small kernel & validated packages -> >>In progress (Bootstrap + Cargo)
In progress
3. A Robust and Extensible System Events -> ?
DONE. Announcements (but now we have ���announcements plague��� so we need to iterate/clean a bit here)
4. Rewrite of Filesystem/Streams -> ?/XStream? -> >>In progress, there was the introduction of File IIRC
FileSystem DONE
Streams NOT DONE
5. Announcements and Ephemerons -> >> Will be in Pharo 6
DONE (in Pharo 6)
6. UI Canvas for Zoomable Interfaces -> Bloc? >>I think yes
In progress: Will be Block, yes
7. Bootstrap of the Core -> >>Should be for Pharo 6. The Bootstrap build pass on Jenkins but still need some love from Christophe, Guillermo and Pavel
In progress.
8. Fully parametrized compiler tool chain -> >>I think I heard that a lot of progress have been made in this area but I don't have any detail and I am not sure.
DONE (OpalCompiler, etc.)
9. Packages as real objects -> >>In progress. now package are objects but there will be improvements with Cargo
DONE. Cargo is another thing :)
10. Package Meta-Data -> >>PackageManifest
DONE (but still tools can be built on it)
11. Less Model Clutter and Duplication -> ?
Permanent ongoing process.
12. Building and Reusing UI Logic -> >>Spec
DONE (Spec), but allows enhancements (as everything, I think)
13. New Network Layer -> >> I think this is Zinc but it still need some work
In progress (Zinc is part, but some low-level stuff can be enhanced)
14. Serializers -> Fuel >> + STON
DONE (Fuel, STON)
15. SystemChangeNotifier replacement -> ?
DONE (SystemAnnouncer)
16. Cleaning Morphic -> Still valid? (asking because of Bloc existance)
Permanent ongoing progress (until Bloc arrives, it needs to be done)
17. Everybody should be able to compile VMs -> ?
DONE (CMakeMaker, etc.)
18. VMs identification and regression testing -> ?
DONE
19. One Unified FFI framework -> Created and still being enhanced
DONE (but yes, a v2.0 will be needed)
20. 64 Bits -> Most of the plugins works on OSX/Unix. Esteban told that it would need around a month to be usable after his holydays.
In progress